Group News
Experimental test on full scale bamboo footbridge model
A full scale bamboo bridge model was constructed and tested under vertical static loading. The bridge is 8m long and 1.2m wide. The materials used for the construction of the bridge are two species of bamboo calms, steel plates and metal dowel fasteners for the connections, as well as, plywood plates for the deck. The assembly of the bridge was completed within a day by a small group of people. The test was conducted by monotonically increasing the applied static vertical load on the deck until failure.[30 May 2016] - loading test of pedestrain bamboo bridge model 2
-
Christmas dinner
All group members get together and have a happy Christmas dinner. Merry Christmas and Happy New Year![19 Dec 2015]
2016
2015
Photo Gallery
- Bamboo bridge
- Christmas dinner (19 Dec 2015)